Structural Steel Heat Straightening |
||||||
|
Description:A logging rig struck the thru-truss, causing major damage to the structure. The upper chord sagged in excess of 25 inches and the lower chord sagged over 15 inches.
Repair Time: 25 days |
|||
| About Us | | | Previous Work | | | The Process | | | Our Fleet | | | FAQ | | | Contact Us | ||
| © 2007 Flame On, Inc. | ||||||||||||